Jump to content

Interstate 476

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia
(Redirected from I-476 (PA))

Interstate 476 marker
Interstate 476
Map
I-476 highlighted in red
Route information
Auxiliary route of I-76
Maintained by PennDOT and PTC
Length132.10 mi[1][2][3] (212.59 km)
HistoryEstablished 1970
Completed on December 16, 1992[2]
Tourist
routes
Blue Route Scenic Byway
NHSEntire route
RestrictionsNo hazardous goods in Lehigh Tunnel
Major junctions
South end I-95 in Woodlyn
Major intersections
North end I-81 / US 6 / US 11 near Clarks Summit
Location
CountryUnited States
StatePennsylvania
CountiesDelaware, Montgomery, Bucks, Lehigh, Carbon, Luzerne, Lackawanna
Highway system
PA 475 PA 476
PA 8PA 9 PA 9
I-479I-480 PA 480
PA 492I-495 PA 501

Interstate 476 (I-476) is a 132.1-mile (212.6 km) auxiliary Interstate Highway of I-76 in the U.S. state of Pennsylvania. The highway runs from I-95 near Chester north to I-81 near Scranton, serving as the primary north–south Interstate corridor through eastern Pennsylvania. It consists of both the 20-mile (32 km) Mid-County Expressway, locally referred to as the "Blue Route", through Delaware and Montgomery counties in the suburban Philadelphia area, and the tolled, 110.6-mile (178.0 km) Northeast Extension of the Pennsylvania Turnpike, which connects the Delaware Valley with the Lehigh Valley, the Pocono Mountains, and the Wyoming Valley to the north.

The Mid-County Expressway passes through suburban areas, while the Northeast Extension predominantly runs through rural areas of mountains, forest, and farmland, with development closer to Philadelphia and in the Lehigh Valley and the Wyoming Valley. I-476 intersects many major roads, including I-76 (Schuylkill Expressway) in West Conshohocken, I-276 (Pennsylvania Turnpike) in Plymouth Meeting, U.S. Route 22 (US 22) near Allentown, and I-80 near Hickory Run State Park.

At its opening in 1979, I-476 was a three-mile-long (4.8 km), four-lane spur expressway connecting the Schuylkill Expressway with Chemical Road in Plymouth Meeting. The highway expanded the capacity for travel between King of Prussia, the Schuylkill Expressway, the Philadelphia Main Line, and Philadelphia suburbs to the city's north and in South Jersey. The highway was initially planned to connect down to I-95 in Delaware County. This portion of the highway opened in 1991.

In 1996, the I-476 designation was affixed to the preexisting Northeast Extension of the Pennsylvania Turnpike, replacing Pennsylvania Route 9 (PA 9). This was an older four-lane pre-Interstate limited-access highway that opened in sections between 1955 and 1957. Of earlier design, its cross section was very narrow, with only 4 feet (1.2 m) between opposing lanes of traffic in places. This extended I-476 north of Plymouth Meeting to Clarks Summit (near Scranton) as a part of the Pennsylvania Turnpike system. I-476 connected to the Northeast Extension at a state-of-the-art three-level interchange. This provided direct access to both I-276 east and I-476 north, now on the Northeast Extension.

With the redesignation of the Northeast Extension, I-476 surpassed I-495 in Massachusetts as the nation's longest auxiliary Interstate Highway. I-476 was widened to six lanes from the Mid-County Interchange to south of Quakertown between 2011 and 2020.

Route description

[edit]

Mid-County Expressway

[edit]
I-476 southbound past PA 3 in Broomall

The portion of I-476 between I-95 and the Pennsylvania Turnpike (I-276) runs north–south through Delaware and Montgomery counties and is officially known as the Mid-County Expressway and the Veterans Memorial Highway, as well as by the nickname the "Blue Route". The road's southern terminus is at a directional T interchange with I-95 near Chester, southwest of Philadelphia in Delaware County, near Philadelphia International Airport.[4]

Heading north, the road passes under CSX's Philadelphia Subdivision rail line and has an interchange with MacDade Boulevard in Woodlyn, where it narrows to a four-lane parkway that runs parallel to the Crum Creek. It winds through the western Philadelphia suburbs of Wallingford and Swarthmore, where I-476 passes under SEPTA's Media/Wawa Line and comes to a diamond interchange with Baltimore Pike just west of Springfield. From here, the freeway crosses over SEPTA's light rail Media–Sharon Hill Line and continues north to Springfield, where it meets US 1 at a three-level diamond interchange.[4]

Past US 1, the parallel Crum Creek splits to the northwest and I-476 continues through wooded suburban areas. Along this stretch, the road briefly gains a southbound truck lane. The freeway comes to a partial cloverleaf interchange with PA 3 in Broomall, where it widens to six lanes.[4] The route continues to Radnor Township, which is part of the Philadelphia Main Line suburbs, reaching an interchange with US 30 west of Villanova.[4] Stone monuments, including a large stone cairn atop a hill and a large crushed-stone image of a mythological griffin on a hillside, were constructed at the US 30 interchange to commemorate Radnor's history as part of the Welsh Tract.[5] Proceeding northward, the road passes over SEPTA's Norristown High Speed Line before it crosses under Amtrak's Keystone Corridor rail line.

The route enters Montgomery County and comes to an interchange with I-76 (Schuylkill Expressway) in West Conshohocken that also has access to PA 23. After crossing over Norfolk Southern's Harrisburg Line, the Schuylkill River, SEPTA's Manayunk/Norristown Line, and the Schuylkill River Trail on the Pearl Harbor Memorial Bridge, the freeway heads into Plymouth Township. In Plymouth Township, the route has interchanges with Ridge Pike and Chemical Road before passing over Norfolk Southern's Morrisville Line and reaching an interchange serving Germantown Pike and Plymouth Road in Plymouth Meeting.[4][6] The entire length of the Blue Route is designated the Blue Route Scenic Byway, a Pennsylvania Scenic Byway.[7]

Pennsylvania Turnpike Northeast Extension

[edit]
Pennsylvania Turnpike marker
Pennsylvania Turnpike Northeast Extension
LocationPlymouth MeetingClarks Summit
Length111.04 mi[8] (178.70 km)
Existed1955–present
I-476 northbound past the Pennsylvania Turnpike (I-276) in Plymouth Meeting
I-476 northbound past US 209 in Franklin Township

In Plymouth Meeting, I-476 comes to the Mid-County Interchange, where it enters the Pennsylvania Turnpike system and has a mainline toll plaza before coming to an interchange with I-276, which follows the mainline of the Pennsylvania Turnpike, heading north from here as the six-lane Northeast Extension of the Pennsylvania Turnpike. The route continues through the Philadelphia suburbs, passing over CSX's Stony Creek Branch rail line, and reaches an interchange with PA 63 west of Lansdale that serves the North Penn Valley region. Past this interchange, the route enters a more rural setting of woods and farms, narrowing to four lanes before crossing into Bucks County and coming to an interchange with PA 663 west of Quakertown. The Northeast Extension continues northwest into Lehigh County, part of the Lehigh Valley metropolitan area, past the PA 663 interchange. The road passes over Norfolk Southern's Reading Line. The route has ramps to the dual-access Allentown Service Plaza in Upper Macungie Township, and, just north of it, I-476 reaches an interchange with US 22 (Lehigh Valley Thruway) west of Allentown, which offers an indirect connection to I-78 and PA 309.[4]

North of Allentown, the route crosses under Norfolk Southern's Catasauqua and Fogelsville Railroad line and runs through farmland with some development. The road passes under Blue Mountain in the Lehigh Tunnel and enters Carbon County in the Pocono Mountains region. Here, I-476 crosses over the Lehigh River and Norfolk Southern's Lehigh Line before it has an interchange with US 209 east of Lehighton. Continuing through mountainous areas, the route has ramps to the dual-access Hickory Run Service Plaza prior to coming to a diamond interchange with PA 903. Past here, I-476 cuts through Hickory Run State Park before reaching an interchange with PA 940 providing a connection to I-80 just to the north of the state park.[4]

The route continues through mountainous terrain, heading into Luzerne County at a crossing of the Lehigh River and coming to an interchange with PA 115 in Bear Creek that provides access to nearby Wilkes-Barre.[4] The route comes to a mainline toll plaza near Pittston that marks the northern end of the closed toll system along the Northeast Extension.[4][9]

A short distance later, an interchange with PA 315 provides indirect access to I-81 and Scranton.[4] Past this interchange, I-476 crosses under a Luzerne and Susquehanna Railway line before it enters Lackawanna County. Here, the route has a bridge over a Luzerne and Susquehanna Railway line and heads through built-up areas of the Wyoming Valley as it skirts around Scranton, passing under I-81 before coming to a bridge over Norfolk Southern's Sunbury Line, the Lackawanna River, and a Reading Blue Mountain and Northern Railroad line. I-476 reaches a mainline all-electronic toll plaza and an exit to Keyser Avenue in Taylor.

North of Scranton in Clarks Summit, the route crosses a valley on the 1,630-foot-long (500 m), 163-foot-high (50 m) John E. Fitzgerald Memorial Bridge,[10] passing over Norfolk Southern's Sunbury Line, US 6/US 11, and PA 407. Past the bridge, I-476 comes to a hairpin curve and reaches a mainline all-electronic toll plaza before it ends at an interchange with connections to I-81, US 6, and US 11. US 6 joins the turnpike for less than 0.25 miles (0.40 km) to connect between I-81 and US 11. As this is beyond the Clarks Summit toll plaza, no toll is collected on this short segment.[6]

Tolls

[edit]
The Mid-County mainline toll plaza, which marks the southern terminus of the Northeast Extension, before conversion to all-electronic tolling

The Northeast Extension of the Pennsylvania Turnpike uses all-electronic tolling, with tolls payable by toll by plate, which uses automatic license plate recognition to take a photo of the vehicle's license plate and mail a bill to the vehicle owner, or E-ZPass. Tolls along the section between the Mid-County and Wyoming Valley toll plazas, along with the mainline Pennsylvania Turnpike between Warrendale and Neshaminy Falls, are based on distance traveled. Mainline toll plazas are also located at Keyser Avenue and Clarks Summit, charging a flat rate using toll by plate or E-ZPass.

There are no tolls on exit ramps between Wyoming Valley and Clarks Summit. As of 2024, it costs a passenger vehicle $26.20 to travel the length of the Northeast Extension between Mid-County and Wyoming Valley using toll by plate and $12.80 using E-ZPass. The Keyser Avenue and Clarks Summit toll plazas cost $3.20 using toll by plate and $1.50 using E-ZPass for passenger vehicles.[11]

Until March 2020, the road used the ticket system method of tolling between the Mid-County and Wyoming Valley toll plazas along with the mainline Pennsylvania Turnpike between Warrendale and Neshaminy Falls.[12] With the ticket system, a motorist received a ticket upon entering the turnpike at an interchange and paid the fare and surrendered the ticket upon exiting. If a motorist lost the ticket, the turnpike charged the highest fare to the exit where the motorist left.[13] Cash, credit cards, and E-ZPass were accepted at traditional toll plazas.[12]

In March 2020, as a result of the COVID-19 pandemic,[14] the all-electronic tolling system on the turnpike will initially use existing toll booths at exits, along with existing equipment at all-electronic tolling interchanges, until mainline toll gantries between interchanges are constructed.[15] Mainline toll gantries are planned to be in operation by 2025.[16][17]

On April 29, 2018, the turnpike commission implemented all-electronic tolling at the Keyser Avenue and Clarks Summit toll plazas.[18][19] All-electronic tolling was originally scheduled to be implemented on the entire length of the Northeast Extension in the later part of 2021.[15]

Services

[edit]

Emergency assistance and information

[edit]

The Northeast Extension formerly had a call box every mile (1.6 km) for its entire length.[20] In September 2017, the turnpike commission began removing the call boxes due to increased mobile phone usage making the call boxes obsolete.[21] Motorists may also dial *11 on their mobile phones. First responder services are available to all turnpike customers via the GEICO Safety Patrol program. The safety patrol program, which is free, looks for disabled motorists, debris, and accidents along the roadway and provides assistance. The patrol service is available 24 hours every day of the year. Each patrol vehicle covers a 20-to-25-mile (32 to 40 km) stretch of the turnpike.[22][23] Towing services are available from authorized service garages located near the highway.[24] Pennsylvania State Police Troop T patrols the Pennsylvania Turnpike Northeast Extension. It has headquarters in Highspire (along the mainline turnpike) and a substation along the Northeast Extension at Pocono.[25]

The Pennsylvania Turnpike Commission (PTC) broadcasts current roadway, traffic, and weather conditions via highway advisory radio transmitters at each exit. Broadcasts are available on 1640 kHz AM and can be received approximately two miles (3.2 km) away from each exit.[26] The 511PA travel information service provides alerts, an interactive map, weather information, and traffic cameras to motorists. There are variable-message signs located along the roadway that provide information to motorists such as accidents, construction, weather, and traffic congestion.[27]

Service plazas

[edit]
The Allentown service plaza

The Northeast Extension of the Pennsylvania Turnpike has two service plazas at Allentown and Hickory Run, which are accessible by both northbound and southbound traffic. The service plazas offer multiple fast-food restaurants, a Sunoco gas station, and a 7-Eleven convenience store. Other amenities are available such as an ATM, E-ZPass sales, free cellphone charging, Pennsylvania Lottery sales, picnic areas, restrooms, tourist information, Travel Board information centers, and Wi-Fi. The Allentown plaza contains a seasonal farmers' market. Both plazas offer conventional gasoline and diesel fuel. The Sunoco and 7-Eleven locations are operated by 7-Eleven itself while the restaurants and general upkeep of the service plazas are operated by Applegreen.[28]

In 2006, HMSHost was awarded a contract to reconstruct the service plazas along the turnpike.[29] The reconstruction of the service plazas, which was to cost more than $150 million (equivalent to $218 million in 2023[30]), included a food court layout and modernized restrooms. The Allentown service plaza was rebuilt between September 2007 and May 2008 while the Hickory Run service plaza was rebuilt between January 2009 and November 2010.[31]

The Art Sparks program was launched in 2017 as a partnership between the turnpike commission and the Pennsylvania Council on the Arts to install public art created by local students in the Arts in Education residency program in service plazas along the turnpike over the next five years. The public art consists of a mural reflecting the area where the service plaza is located.[32][33]

History

[edit]

Mid-County Expressway

[edit]
Interstate 495 marker
Interstate 495
LocationWoodlynPlymouth Meeting
Existed1956–1958
Interstate 480 marker
Interstate 480
LocationWoodlynPlymouth Meeting
Existed1958–1964
A 1960 map of central Delaware County, outlining the proposed corridors of the Mid-County Expressway
A stretch of the Mid-County Expressway near the now-closed Haverford State Hospital in the early 1970s; the stretch was completed in the early 1990s.

Originally planned as far back as 1929, the Mid-County Expressway was later proposed by the Pennsylvania Turnpike Commission as the "Chester Extension" of the Pennsylvania Turnpike in 1954. After the advent of the Interstate Highway System, the project was transferred to the Pennsylvania Department of Highways to be built as part of the system, designating it first as Interstate 495 (I-495) and later as Interstate 480 (I-480), as I-76 was designated as I-80S at the time. The present-day I-476 designation was assigned on February 6, 1964, when I-80S was renumbered as I-76.[34]

The road received its nickname from a 1958 location report indicating various proposed geographic configurations of an expressway through Delaware County with lines of various colors on a map. The "blue route" through the Crum Creek valley won out over other contenders, which included a more easterly "red route" and "yellow route" and a more westerly "green route".[35]

As one of the most controversial Interstate Highways in Pennsylvania, construction of I-476 began in 1967 but would take decades to build due to litigation between the Pennsylvania Department of Transportation (PennDOT) and several communities in the road's path over environmental concerns. Two sections of the road in Radnor Township and in Lower Merion Township were built in 1970 but remained closed to traffic as they did not connect to any other roads. The section of I-476 between I-76 and Chemical Road opened to traffic in 1979 while the section between I-95 and MacDade Boulevard opened to traffic in August 1988. The road opened between Chemical Road and Plymouth Road in August 1991 while the final section of I-476 between MacDade Boulevard and I-76 was opened in December 1991.[35]

An agreement in 1985 led to many environmental compromises in the road's design, including a downsized four-lane design south of PA 3 (although a part of the span between exits 9 and 5 has a third truck lane on the southbound side), ramp meters, and scenic route status, prohibiting the erection of advertisement billboards along the entire freeway portion. The Radnor Gateway Enhancement Strategy was implemented to install large scale sculpture elements by artist William P. Reimann, most notably the stone griffin and cairn at exit 13.[36] While the redesigned highway was largely well-received, the constriction to four lanes has led to bottleneck conditions in the area, and many communities that originally opposed the road have now called for its widening.[37] The Philadelphia Inquirer dubbed I-476 "the most costly, most bitterly opposed highway in Pennsylvania history" due to the decades of opposition it garnered.[38]

I-476 northbound at PA 3 in Broomall

Plans to build an interchange connecting I-476 (Mid-County Expressway) to the Pennsylvania Turnpike were made; the turnpike commission approved a contract to build the interchange in March 1989.[39] That June, a losing bidder decided to challenge the turnpike commission, saying it violated female and minority contracting rules regarding the percentage of these employees that were used for the project. Under this rule, bidders were supposed to have at least 12 percent of contracts to minority-owned companies and at least four percent to female-owned companies. The losing bidder had 12.4 percent of the contracts to minority companies and 4.2 percent to female-owned companies while the winning bidder had 6.1 percent and 3.7 percent respectively. The turnpike commission decided to rebid the contract but was sued by the original contractor. This dispute delayed the construction of the interchange.[40] The contract was rebid in November 1989 after the Supreme Court of Pennsylvania permitted it.[41] The interchange between I-476 and the turnpike mainline was completed in November 1992; the ramps to the Northeast Extension opened a month later.[42][43] An official ribbon-cutting took place on December 15, 1992.[44]

In the 2000s, the road underwent a rehabilitation project, including paving, bridge repair, and ramp maintenance of the entire length of the freeway between I-95 and the Pennsylvania Turnpike. The section between I-95 and PA 3 was repaved in 2005 while the section between PA 3 and I-76 was repaved in 2007.[45] The section between I-76 and I-276, which was completely reconstructed, was finished in the end of 2011.[46]

PennDOT has plans to improve I-476 to reduce traffic congestion. Smart technology will be added to detect traffic congestion. The first phase will add variable speed limits that can change based on weather and congestion, new ramp meters, and electronic signs. The left shoulders of the roadway between I-95 and PA 3 will be widened and used as a third travel lane during peak traffic periods. Construction on the smart technology is underway while construction of the third lane is expected to begin in 2026. This improvement project is planned to be completed in 2030.[47]

Northeast Extension

[edit]
Pennsylvania Route 9 marker
Pennsylvania Route 9
LocationPlymouth MeetingClarks Summit
Length111.04 mi[8] (178.70 km)
Existed1974–1996

In 1953, an extension of the Pennsylvania Turnpike from the mainline near Plymouth Meeting north through Northeastern Pennsylvania to the New York state line near Binghamton, New York, was proposed.[48][49] Groundbreaking for the Northeastern Extension occurred on March 25, 1954, in White Haven, with Governor John S. Fine and commission chair Thomas J. Evans present. The Northeast Extension was planned to run from the mainline Pennsylvania Turnpike in Plymouth Meeting north to a temporary terminus at Scranton.[50] In April 1954, $233 million (equivalent to $2.1 billion in 2023[30]) in bonds were issued to build the Northeastern Extension along with the Delaware River–Turnpike Toll Bridge on the mainline Pennsylvania Turnpike.[51]

The Northeast Extension was built with a four-foot (1.2 m) median in order to save money.[52] Due to the mountainous terrain it passed through, a large amount of earthwork was necessary to build the road along with the construction of large bridges.[53] Among the bridges built was the 1,630-foot-long (500 m) Clarks Summit Bridge (since renamed for John J. Fitzgerald, Turnpike engineer and superintendent) over US 6/US 11, which at the time was the tallest bridge on the Pennsylvania Turnpike system at 135 feet (41 m).[10][54] The Northeast Extension also included the two-lane Lehigh Tunnel under Blue Mountain. The tunnel was originally going to be named for commission chair Evans but was changed when he was convicted of conspiracy to defraud the commission of $19 million (equivalent to $133 million in 2023[30]).[53]

The roadway opened between Plymouth Meeting and the Lehigh Valley interchange near Allentown on November 23, 1955. The highway was extended north to a temporary interchange at Emerald on December 28 of that year.[55] The Northeast Extension was opened between Emerald and Wyoming Valley on April 1, 1957.[56] The entire length of the Northeast Extension was finished on November 7, 1957, with the completion of the northernmost part between Wyoming Valley and Scranton.[57] The part of the Northeast Extension between Scranton and the New York state line was not built as part of the Pennsylvania Turnpike system but rather the Interstate Highway System as I-81.[58][59] At the northern terminus, the Northeast Extension narrowed to two lanes along the northbound offramp at Scranton to come to its northern terminus, with an abandoned short spur of the mainline heading north. A pair of trumpet interchanges were built to connect the Northeast Extension and I-81.[59]

On April 14, 1969, a project which deconstructed the grass median and replaced it with a metallic jersey barrier was completed.[60]

In 1974, the roadway was designated PA 9.[61][62][63]

The tickets along the Northeast Extension of the Pennsylvania Turnpike were originally handed out by person. In 1987, machines started to replace humans in distributing tickets.[64]

Lehigh Tunnel southbound
I-476 northbound at the exit for PA 903 in Penn Forest Township

When it first opened, traffic on the Northeast Extension of the Pennsylvania Turnpike was light.[52] By the 1970s, traffic along the roadway increased with the completion of the connecting I-80 and the rising popularity of the Pocono Mountains as a vacation destination. As a result, the two-lane Lehigh Tunnel faced serious congestion. Plans were made to either bypass the tunnel or add a second tube. The turnpike commission decided it would build a second tunnel as the cost was lower than building a bypass.[65] In 1988, a $37-million (equivalent to $82.3 million in 2023[30]) contract was awarded to build the second tube.[66] Groundbreaking for the tunnel took place on February 14, 1989, with Governor Robert P. Casey in attendance.[67]

Excavation of the new tunnel began in July of that year. Construction of the second tube utilized the New Austrian tunneling method, which reduced the cost of the tunnel by $5 million to $6 million (equivalent to $11.1 million to $13.3 million in 2023[30]). It was the first tunnel in the US to use this construction method. The second tube at Lehigh Tunnel opened on November 22, 1991, with Governor Casey in attendance leading a line of antique cars. Construction of the tunnel cost $45 million (equivalent to $89.8 million in 2023[30]). The new tube is used for southbound traffic while the original tube carries northbound traffic. The newer tunnel is wider, higher, and brighter than the original.[68]

On February 1, 1995, the Keyser Avenue interchange near Scranton was opened at a cost of $22.4 million (equivalent to $40.9 million in 2023[30]). Construction of this interchange also involved constructing a new mainline flat-rate toll barrier near the new interchange.[69]

On November 1, 1996, the Northeast Extension was added to the Interstate Highway System as a northern extension of I-476, replacing the PA 9 designation along the road. The addition of the second tube at the Lehigh Tunnel along with new guardrails and line striping was necessary for the toll road to become an Interstate. It was hoped that the Interstate designation would bring economic development and tourism to the areas served by the roadway.[70] This extension resulted in I-476 surpassing the 120-mile (190 km) I-495 in Massachusetts as the longest auxiliary Interstate Highway,[71] though it could be contested for this title in the future by I-369 in Texas.

In 1990, an electronic toll collection system was proposed for the Pennsylvania Turnpike, where a motorist would create an account and use an electronic device that would be read from an electronic tollbooth. The motorist would be billed later.[72] The multi-state electronic tolling system, which was to be called E-ZPass, was planned to be implemented by 1998.[73][74] The planned installation date was later pushed back to 2000.[75] On December 2, 2000, E-ZPass debuted along the Northeast Extension of the Pennsylvania Turnpike between Mid-County and Lehigh Valley.[76][77] On December 15, 2001, E-ZPass was extended to include the entire length of the Northeast Extension of the Pennsylvania Turnpike.[78][79] Commercial vehicles were allowed to start using E-ZPass on December 14, 2002.[80]

On November 24, 2004, the day before Thanksgiving, 2,000 Teamsters Union employees went on strike, after contract negotiations failed. This was the first strike in the history of the roadway. As this is usually one of the busiest traffic days in the US, to avoid traffic jams, tolls were waived for the rest of the day.[81] Starting on November 25, turnpike management personnel collected flat-rate passenger tolls of $2 and commercial tolls of $15 from cash customers on the ticketed system, while E-ZPass customers were charged the lesser of the actual toll or the same flat rates.[82] The strike ended after seven days when both sides reached an agreement on November 30, 2004. Normal toll collection resumed December 1, 2004.[83]

I-476 North in Whitpain Township

In 2007, the turnpike commission announced plans to widen the Northeast Extension to six lanes between Mid-County and Lansdale.[84] The project divided this stretch of highway into two sections. Work on the southern section began in January 2008 with the replacement of two bridges over the Northeast Extension to accommodate the widened highway. Construction on the actual widening phase commenced in January 2011. Completion was originally planned in 2013; however, construction fell a year behind schedule.[85][86]

Construction on widening the northern section started in May 2014, while work on widening the southern section finished up in October of that year. By this point, the project scope was expanded to include the Lansdale interchange itself, the roadway to a point one mile (1.6 km) north of the interchange, and two new E-ZPass-only ramps at the Lansdale interchange to relieve congestion at the toll plaza. This new northbound exit ramp opened December 4, 2016, and the companion southbound onramp opened a week later.[87] Construction along the northern section was originally planned to finish by the end of 2016 but was delayed until mid-2017.[88] Construction was substantially completed, with all six lanes open, by August 31, 2017.[89]

Once widening was completed from Mid-County to Lansdale, a similar project began on the next segment of highway, from Lansdale to Quakertown. As done on the first project, the Lansdale–Quakertown segment was rebuilt in two sections, with a southern half started in late 2017, widening the road to six lanes with full shoulders.[85] Advance work began in early 2013 with replacement of several bridges in this area north of Lansdale, with work on the actual widening beginning in late 2017.[90] Widening of this section was completed in late 2020.[91] In April 2022, construction began on widening the northern section of the roadway between Lansdale and Quakertown, with completion expected in early 2025.[92]

The turnpike commission has stated its intention of continuing the widening effort past Quakertown all the way north to the Lehigh Valley interchange at milepost 56,[93] although it will take until the late 2020s to get it done.

In 1990, plans were made to build an interchange at PA 903 in Carbon County. A bill authorizing construction of this interchange was signed into law by Governor Casey in July of that year.[94] Plans for this interchange were cancelled by the turnpike commission in 1995.[95] In 2006, plans for an interchange at PA 903 were resurrected, with the proposed interchange to be all-electronic, in that it will only accept E-ZPass.[96] Construction on the $23-million (equivalent to $32 million in 2023[30]) interchange began in the middle of 2008.[97][98] The interchange opened to traffic on June 30, 2015.[99]

On April 28, 2016, plans were announced for a "Scranton Beltway" to use I-476 as a bypass for I-81 around the heavily congested segment through Scranton and its suburbs. The turnpike between the two I-81 interchanges carries an average of 10,000 vehicles per day vs. 70,000 on the parallel segment of I-81. This project will build two high-speed connections between I-476 and I-81: one south of Scranton in Dupont and one north of Scranton in South Abington Township. Tolls on the connections will be paid with E-ZPass or toll by plate. Construction of this project is expected to cost $160 million.[100] In 2021, design work on the project resumed, with construction expected to begin in 2025.[101]

On February 21, 2018, Howard M. Sexton, a 70-year-old truck driver from New Jersey, was killed in the southbound Lehigh Tunnel, when an electrical conduit broke free from the tunnel's ceiling and fell through the windshield of his truck, striking him in the head.[102] In a preliminary report issued on May 1, 2018, the National Transportation Safety Board revealed that a 10-foot-long (3.0 m) section of conduit fell into the path of Sexton's truck after the steel support system for the conduits, which were suspended from the apex of the tunnel arch directly over the travel lanes, failed. The tunnel had last been inspected in 2016, at which time an inspector found evidence of corrosion on several of the steel support straps.[103]

In late 2021, construction began to replace the functionally obsolete Hawk Falls Bridge that carries I-476 over Mud Run in Carbon County. The replacement bridge will be a 720 feet (220 m) long steel bridge that will include shoulders. Construction of the replacement bridge is expected to be completed in the middle part of 2026.[104]

Exit list

[edit]

The old exit numbers (31 and upward) on the Northeast Extension were a continuation of old exit numbers 1 through 30 on the east–west turnpike. On the east–west turnpike, the interchange with I-476 was old exit 25A because it was between old exits 25 and 26 on the east–west turnpike.

CountyLocationmi[8]kmOld exit
[105]
New exit
[105]
NameDestinationsNotes
DelawareRidley Township0.000.00 I-95 – Philadelphia, ChesterSouthern terminus; exit 7 on I-95; access to Philadelphia International Airport
0.480.7711MacDade BoulevardAccess to Widener University
Nether Providence Township3.395.4623Media, SwarthmoreAccess via Baltimore Pike; access to Springfield
Marple Township5.078.1635 US 1 – Lima, Springfield
8.7714.1149 PA 3 – Broomall, Upper DarbyAccess to Newtown Square and Havertown
Radnor Township13.2421.31513 US 30 – St. Davids, Villanova
MontgomeryLower Merion TownshipWest Conshohocken line15.8425.49616
I-76 to PA 23 – Philadelphia, Valley Forge, Conshohocken
Signed as exits 16A (east) and 16B (west); access to PA 23 via Matsonford Road; exits 331A-B on I-76
Plymouth Township18.8130.27718Conshohocken, NorristownNo southbound exit to Conshohocken; signed as exits 18A (Conshohocken) and 18B (Norristown) northbound; access via Ridge Pike and Chemical Road
19.6931.69819Plymouth MeetingNorthbound exit and southbound entrance; access via Chemical Road
19.9732.14920



Germantown Pike west to I-276 west / Penna Turnpike west – Harrisburg
Plymouth Road
Northbound exit and southbound entrance; exit 333 (Norristown) on I-276 / Penna Turnpike
Mid-County Toll Plaza (southern end of Penna. Tpk. NE Extension)
20.3332.7225A20Mid-County
I-276 / Penna Turnpike to I-95 – Harrisburg, New Jersey, New York City
No northbound exit to I-276 west or southbound entrance from I-276 east; exit number and interchange name not signed northbound
Towamencin Township30.7849.543131Lansdale PA 63 – Kulpsville, HarleysvilleSigned as exits 31A (east) and 31B (west) northbound
BucksMilford Township44.3971.443244Quakertown PA 663 – Quakertown, Pottstown
LehighUpper Macungie Township56.3790.72Allentown Service Plaza
South Whitehall Township57.7192.883356Lehigh Valley

US 22 to I-78 / PA 309 – Allentown, Harrisburg
Blue Mountain71.68115.36Lehigh Tunnel
CarbonFranklin Township75.73121.883474Mahoning Valley US 209 – Lehighton, StroudsburgAccess to Jim Thorpe
Penn Forest Township86.62139.40Hickory Run Service Plaza
87.39140.6487Route 903 PA 903 – Jim Thorpe, Lake HarmonyAccess to Long Pond
Kidder Township94.82152.603595Pocono I-80 / PA 940 – Hazleton, Mount PoconoExit 277 on I-80
LuzerneBear Creek Township105.85170.3536105Wilkes-Barre PA 115 – Wilkes-Barre, Bear Creek
Pittston Township113.42182.53Wyoming Valley Toll Plaza (northern end of closed toll system)
115.17185.3537115Wyoming Valley
PA 315 to I-81 – Pittston, Scranton
Scranton not signed southbound; exit 175 on I-81
LackawannaTaylor121.61195.71Keyser Avenue Toll Plaza (E-ZPass or toll-by-plate)
122.36196.9238122Keyser AvenueOld Forge, TaylorAccess via Keyser Avenue
South Abington Township131.20211.15Clarks Summit Toll Plaza (E-ZPass or toll-by-plate)
131.37211.4239131Clarks Summit
I-81 / US 6 east – Binghamton, Wilkes-Barre

US 6 west / US 11 – Scranton, Clarks Summit
Northern terminus; exit 194 on I-81; to I-84 / I-380
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

See also

[edit]

References

[edit]
  1. ^ "Resurfacing" (PDF). I-476 Improvement Project. Pennsylvania Department of Transportation. Archived from the original (PDF) on June 15, 2007. Retrieved March 7, 2007.
  2. ^ a b Jeremy Rogoff; Mari A. Schaefer (June 10, 2007). "No remedy soon for a clogged Blue Route". The Philadelphia Inquirer. p. 2.
  3. ^ "Pennsylvania Turnpike Toll/Mileage Calculator". Pennsylvania Turnpike Commission. Retrieved March 7, 2007.
  4. ^ a b c d e f g h i j "overview of Interstate 476" (Map). Google Maps. Retrieved June 1, 2009.
  5. ^ Radnor Township website Archived August 20, 2007, at the Wayback Machine, Gateway Enhancement Strategy
  6. ^ a b Official Tourism and Transportation (PDF) (Map). Pennsylvania Department of Transportation. 2015. Retrieved February 2, 2016.
  7. ^ "Blue Route". VisitPA.com. Retrieved March 27, 2012.
  8. ^ a b c DeLorme Street Atlas USA 2007, Toggle Measure Tool. Retrieved on February 27, 2007.
  9. ^ "Toll Schedule – Cash Rates" (PDF). Pennsylvania Turnpike Commission. January 4, 2009. Archived from the original (PDF) on March 27, 2009. Retrieved June 1, 2009.
  10. ^ a b Coyle, Ellen (February 17, 2010). "The Bridge that John Built". Abington Suburban. Retrieved July 21, 2017.[permanent dead link]
  11. ^ 2024 Toll Schedule (PDF). Pennsylvania Turnpike Commission. 2024. Retrieved January 7, 2024.
  12. ^ a b 2019 Toll Schedule (PDF). Pennsylvania Turnpike Commission. 2019. Retrieved January 7, 2019.
  13. ^ "Traffic Rules and Regulations". Pennsylvania Turnpike Commission. Retrieved August 3, 2015.
  14. ^ Tierney, Jacob (June 2, 2020). "Pennsylvania Turnpike to lay off 500 employees, make cashless tolling permanent". TribLive. Retrieved June 2, 2020.
  15. ^ a b Blazina, Ed (November 2, 2019). "Pa. Turnpike won't take cash by fall 2021". The Philadelphia Inquirer. Retrieved November 3, 2019.
  16. ^ Kratz, Alyssa (December 2, 2022). "Pennsylvania Turnpike to implement open road tolling by 2025". York, PA: WPMT-TV. Retrieved January 1, 2023.
  17. ^ "Open Road Tolling". Pennsylvania Turnpike Commission. Retrieved May 2, 2023.
  18. ^ "No Cash Zone - Keyser Avenue / Clarks Summit". Pennsylvania Turnpike Commission. Archived from the original on May 22, 2020. Retrieved April 9, 2018.
  19. ^ Senior, Chase (April 27, 2018). "Cashless Tolling Takes Effect on Turnpike in Lackawanna County". Scranton, PA: WNEP-TV. Retrieved April 30, 2018.
  20. ^ "Emergency Call Boxes". Pennsylvania Turnpike Commission. Archived from the original on June 11, 2016. Retrieved September 11, 2017.
  21. ^ "PA Turnpike Call Box Removal Begins Next Week" (Press release). Pennsylvania Turnpike Commission. September 8, 2017. Archived from the original on September 11, 2017. Retrieved September 11, 2017.
  22. ^ "Safety Patrol Program". Pennsylvania Turnpike Commission. Retrieved November 10, 2021.
  23. ^ "PA Turnpike Commission Announces GEICO as New Sponsor of Roadway Safety Patrol" (Press release). Pennsylvania Turnpike Commission. Retrieved November 10, 2021.
  24. ^ "If Your Vehicle Breaks Down..." Pennsylvania Turnpike Commission. Retrieved August 3, 2015.
  25. ^ "Pennsylvania State Police - Troop T". Pennsylvania State Police. Retrieved January 8, 2018.
  26. ^ "HAR Transmissions Now Broadcast at Every PA Turnpike Interchange". Pennsylvania Turnpike Commission. July 3, 2000. Archived from the original on August 19, 2003. Retrieved April 14, 2009.
  27. ^ "Advanced Travelers Information System". Pennsylvania Turnpike Commission. Retrieved November 26, 2021.
  28. ^ "Service Plazas". Pennsylvania Turnpike Commission. Retrieved November 26, 2021.
  29. ^ "Pennsylvania Turnpike Contract Awarded to HMSHost". Business Wire. July 28, 2006.
  30. ^ a b c d e f g h Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  31. ^ "Service Plazas: Tentative Reconstruction Schedule". Pennsylvania Turnpike Commission. Archived from the original on July 3, 2015. Retrieved August 29, 2015.
  32. ^ "Art Sparks". Pennsylvania Turnpike Commission. Retrieved June 8, 2017.
  33. ^ "New arts program will connect student artists to PA Turnpike" (Press release). Pennsylvania Turnpike Commission. March 30, 2017. Archived from the original on April 2, 2017. Retrieved June 8, 2017.
  34. ^ "Was I-76 Numbered to Honor Philadelphia for Independence Day, 1776?". Ask the Rambler. Federal Highway Administration. January 18, 2005. Retrieved June 6, 2007.
  35. ^ a b "History of the Blue Route". I-476 Improvement Project. Pennsylvania Department of Transportation. Archived from the original on February 19, 2007. Retrieved June 11, 2007.
  36. ^ Fleming, Ronald Lee (October 8–11, 1992). "Making Connections: an integrated approach to urban design along the highway". Proceedings of the International Symposium on Design Review. (Routledge Revivals): University of Cincinnati.
  37. ^ "Asphalt: the Magazine of the Asphalt Institute, Summer 1997" (PDF). Archived from the original (PDF) on June 15, 2007. Retrieved March 7, 2007.
  38. ^ "FHWA By Day - December 19". Retrieved March 7, 2007.
  39. ^ "Phila. Firm To Oversee Montco Turnpike Project Briefly". The Morning Call. Allentown, PA. March 8, 1989. p. B02.
  40. ^ Turcol, Thomas (October 26, 1989). "Lawsuit Delays Blue Route - Turnpike Link". The Philadelphia Inquirer. p. B01.
  41. ^ Mayer, Cynthia (June 24, 1990). "Blue Route Delay Is Expected Completion Is Now Seen By Late 1991". The Philadelphia Inquirer. p. B01.
  42. ^ Ferry, Joseph P. (November 9, 1992). "Turnpike Opens New Interchange At Norristown". The Morning Call. Allentown, PA. p. B4A.
  43. ^ "Blue Route Opens Turnpike Linkup". Press of Atlantic City. December 16, 1992. p. A2.
  44. ^ Ferry, Joseph P. (December 16, 1992). "Opening Of Blue Route Link Fits Missing Piece In Puzzle". The Morning Call. Allentown, PA. p. B01.
  45. ^ "The New I-476 Improvement Project". I-476 Improvement Project. Pennsylvania Department of Transportation. Archived from the original on January 1, 2009. Retrieved January 14, 2022.
  46. ^ "The I-476/Blue Route Improvement Project". I-476 Improvement Project. Pennsylvania Department of Transportation. Archived from the original on December 29, 2011. Retrieved January 14, 2022.
  47. ^ MacDonald, Tom (August 18, 2024). "PennDOT unveils plan to widen the Blue Route to ease I-476 congestion". Philadelphia, PA: WHYY. Retrieved August 20, 2024.
  48. ^ "Tax-Exempts: Pennsylvania Turnpike Board Plans 125-Mile North-South Extension". The Wall Street Journal. August 5, 1953. p. 11.
  49. ^ "Surveys To Expand Pennsylvania Pike". The New York Times. August 9, 1953. p. 56.
  50. ^ "Turnpike Link Begins". The New York Times. March 26, 1954. p. 28.
  51. ^ "Pike Funds Raised By Pennsylvania". The New York Times. April 8, 1954. p. 41.
  52. ^ a b Dakelman and Schorr, p. 105.
  53. ^ a b Dakelman and Schorr, p. 106.
  54. ^ Dakelman and Schorr, p. 107.
  55. ^ Cupper, p. 31.
  56. ^ "Pennsylvania Pike Spur To Scranton Area Opens". The New York Times. April 2, 1957. p. 26.
  57. ^ "Pennsylvania Turnpike Opens Its Final Section". The New York Times. November 8, 1957. p. 21.
  58. ^ "Turnpike To The Poconos". The New York Times. November 10, 1957. p. 163.
  59. ^ a b Dakelman and Schorr, p. 108.
  60. ^ "Pennsylvania Highways: Pennsylvania Turnpike".
  61. ^ "General Highway Map, Lehigh County, Pennsylvania, 1974" (PDF). PennDOT: County Type 10 Maps (Historic). Pennsylvania Dept. of Transportation. Retrieved April 25, 2020.
  62. ^ "General Highway Map, Carbon County, Pennsylvania, 1974" (PDF). PennDOT: County Type 10 Maps (Historic). Pennsylvania Dept. of Transportation. Retrieved April 25, 2020.
  63. ^ Pennsylvania Official Transportation Map (PDF) (Map). Pennsylvania Department of Transportation. 1980. Archived from the original (PDF) on March 7, 2016. Retrieved January 29, 2015.
  64. ^ Blankenship, Karl (July 22, 1987). "That's the ticket: Machines replacing man on turnpike". The Patriot-News. Harrisburg, PA. p. B1.
  65. ^ Cupper, p. 40.
  66. ^ Cupper, p. 46.
  67. ^ Orenstein, Robert H. (February 15, 1989). "Tunnel Project Blasts Off Governor Marks Start Of Construction". The Morning Call. Allentown, PA. p. B03.
  68. ^ Laylo, Bob (November 23, 1991). "New Lehigh Tunnel Opens On Turnpike". The Morning Call. Allentown, PA. p. A03.
  69. ^ "Turnpike Soon To Get New Lackawanna Exit". The Morning Call. Allentown, PA. January 25, 1995. p. B06.
  70. ^ "PA Turnpike's Northeast Extension Now An Interstate". Erie Times-News. Associated Press. November 18, 1996.
  71. ^ "Route Log and Finder List, table 2". Federal Highway Administration. October 31, 2002. Retrieved March 7, 2007.
  72. ^ "Drive Now, Pay The Toll Later Pike Travelers Favor The Electronic System". Philadelphia Daily News. July 12, 1990. p. 28.
  73. ^ "Electronic tolls coming to Pa. Turnpike by 1998". Lancaster New Era. Associated Press. March 22, 1994. p. A03.
  74. ^ Gilbert, Pat R. (March 22, 1994). "7 Agencies OK Electronic Toll-Collection Firm - Project Expected To Speed Traffic On Parkway, Turnpike". The Record. Bergen County, NJ. p. A03.
  75. ^ Wyckoff, P.L. (March 12, 1998). "E-ZPass to debut on Atlantic City highway - But 2000 is target for Turnpike and Parkway". The Star-Ledger. Newark, NJ. p. 22.
  76. ^ Downs, Jere (December 3, 2000). "E-ZPass Off To UnE-Z Beginning On Turnpike". The Philadelphia Inquirer. p. B04.
  77. ^ "E-ZPass not so easy for drivers on first day". Erie Times-News. Associated Press. December 3, 2000.
  78. ^ "Pennsylvania Turnpike extends E-ZPass service". The Express-Times. Easton, PA. December 15, 2001.
  79. ^ Fuoco, Michael A. (December 22, 2001). "Turnpike E-ZPass Will Get More Lanes". Pittsburgh Post-Gazette. p. D-6.
  80. ^ Therolf, Garrett (December 15, 2002). "E-ZPass making life harder for bridge users". The Morning Call. Allentown, PA. p. B1.
  81. ^ Wartenberg, Steve (November 25, 2004). "Turnpike strike lops tolls for a day ** 2,000 Teamsters take action. Non-union staff will be in booths today". The Morning Call. Allentown, PA. p. A1.
  82. ^ Shields, Jeff (November 26, 2004). "Traffic moves, despite strike - Turnpike managers working the toll booths gave drivers a pass when backups occurred. Negotiations were on hold". The Philadelphia Inquirer. p. B01.
  83. ^ "Turnpike returns tolls to normal - Drivers were issued tickets beginning at 9:00 p.m. Wednesday". The Express-Times. Easton, PA. December 2, 2004. p. B1.
  84. ^ Wilen, John (March 30, 2007). "Turnpike to widen Northeast Extension - The Turnpike Commission has already notified more than 100 homeowners it wants to buy some or all of their property. Homeowners between Lansdale and Quakertown: You're next". The Intelligencer. Doylestown, PA. p. A03.
  85. ^ a b Yates, Riley (January 7, 2008). "Bridge work could slow highway traffic". The Intelligencer. Doylestown, PA. p. 1.
  86. ^ Nussbaum, Paul (December 15, 2012). "Northeast Extension project a year behind schedule. But why?". The Philadelphia Inquirer. p. A01.
  87. ^ "E-ZPass Only Ramps to Open at Lansdale Interchange on Northeastern Extension". Pennsylvania Turnpike Commission. December 2, 2016. Archived from the original on January 3, 2017. Retrieved January 1, 2017.
  88. ^ "Current Project Overview and Schedule - Milepost A20-A31 Total Reconstruction Project". Pennsylvania Turnpike Commission. Retrieved April 30, 2016.[permanent dead link]
  89. ^ Olson, James (July 12, 2017). "Northeast Extension widening project could wrap up in August". The Reporter. Lansdale, PA. Retrieved August 31, 2017.
  90. ^ "Northeastern Extension, Milepost A31 - A38 - Project Schedule". Pennsylvania Turnpike Commission. Archived from the original on June 2, 2016. Retrieved April 30, 2016.
  91. ^ "Turnpike Milepost A31 - A38 Project". Pennsylvania Turnpike Commission. Retrieved February 8, 2021.
  92. ^ "Milepost A38-A44 Total Reconstruction". Pennsylvania Turnpike Commission. Retrieved December 24, 2023.
  93. ^ Sheehan, Daniel Patrick (October 2, 2015). "PA Turnpike wants to extend Northeast Extension widening to Lehigh Valley". The Morning Call. Allentown, PA. Archived from the original on August 31, 2017. Retrieved August 31, 2017.
  94. ^ "Harrisburg News: Casey Signs Interchange Bill". The Morning Call. Allentown, PA. July 13, 1990. p. B03.
  95. ^ Braden, Tyra (August 24, 1995). "Carbon Turnpike Project Canceled - Commission Scraps Penn Forest Interchange Talks, Irks Legislator". The Morning Call. Allentown, PA. p. B03.
  96. ^ Parker, Chris (April 28, 2006). "E-ZPass slip ramps on Turnpike in Pocono area garners support ** Plan would build them off Northeast Extension in Carbon". The Morning Call. Allentown, PA. p. B5.
  97. ^ Hartzell, Dan (October 11, 2010). "Long road ahead to Poconos access from Turnpike". The Morning Call. Allentown, PA. p. A5.
  98. ^ "Constructing a New EZ Pass Only Interchange Exit #87 on the NE Extension at Route 903". Pennsylvania Turnpike Commission. Archived from the original on January 9, 2015. Retrieved January 9, 2015.
  99. ^ Michlowski, Bill (June 30, 2015). "New Turnpike Interchange Opens in Carbon County". Scranton, PA: WNEP-TV. Retrieved June 30, 2015.
  100. ^ "Pennsylvania Turnpike and PennDOT Announce Next Step for Planned I-81-Turnpike Beltway for Scranton Region - Plan to Address Congestion Relief" (Press release). Pennsylvania Turnpike Commission. April 28, 2016. Archived from the original on April 10, 2017. Retrieved April 30, 2016.
  101. ^ Murtha, Claudia (December 10, 2021). "Scranton Beltway project design restart announced". Hazleton, PA: WOLF-TV. Retrieved December 30, 2021.
  102. ^ "A deadly accident in the Lehigh Tunnel, once the capstone to the Pennsylvania Turnpike". lehighvalleylive.com. February 24, 2018. Retrieved February 24, 2018.
  103. ^ "Preliminary Report Highway: HWY18FH006" (PDF). National Transportation Safety Board. Retrieved May 1, 2018.
  104. ^ "Milepost A89 Hawk Falls". Pennsylvania Turnpike Commission. Retrieved August 5, 2024.
  105. ^ a b "Pennsylvania Exit Numbering" (PDF). Pennsylvania Department of Transportation. Retrieved October 2, 2007.
[edit]
KML is from Wikidata